{"id":20,"date":"2016-10-25T07:53:22","date_gmt":"2016-10-25T07:53:22","guid":{"rendered":"http:\/\/globalenergy.com.qa\/?page_id=20"},"modified":"2016-11-02T08:20:53","modified_gmt":"2016-11-02T08:20:53","slug":"our-parent-company","status":"publish","type":"page","link":"https:\/\/www.globalenergy.com.qa\/?page_id=20","title":{"rendered":"Our Parent Company"},"content":{"rendered":"
1) Al-Nisf Switchgear Plant
\n2) Al-Nisf Transformer Plant
\n3) Al-Nisf Lighting Division
\n4) Al-Nisf Commercial (Trading) Division
\n5) Al-Nisf Contracting Division<\/p>\n<\/div>\n\t\t<\/div><\/div><\/div>
\n\u2022 The AL Nisf Switchgear Plant facilities were started up in the year 1973.
\n\u2022\t Backed up fully by AL Nisf corporate culture.
\n\u2022\t Having a total strength of around 225 personnel.
\n\u2022\t A group of qualified and experienced Engineers manning the
\n key departments- Engineering Design, Estimation & Sales,
\n Industrial Engineering, Production, Procurement, Quality
\n Assurance, and After Sales Servicing.
\n\u2022\t State-of-the-art Manufacturing centre backed by Modern
\n Manufacturing Equipments, Test Equipments and Design
\n Engineering Activities.
\n\u2022\t Design solutions developed and Type Tested at International
\n Test Labs for compliance to relavent International Standards.
\n\u2022\t An ISO 9001:2008 certified company confirming to Quality
\n Management System as per ISO. <\/p>\n<\/div>\n\t\t<\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"
1) Al-Nisf Switchgear Plant 2) Al-Nisf Transformer Plant 3) Al-Nisf Lighting Division 4) Al-Nisf Commercial (Trading) Division 5) Al-Nisf Contracting Division \u2022 The AL Nisf Switchgear Plant facilities were started up in the year 1973. \u2022 Backed up fully by AL Nisf corporate culture. \u2022 Having a total strength of around 225 personnel. \u2022 A […]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-20","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=\/wp\/v2\/pages\/20","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20"}],"version-history":[{"count":3,"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=\/wp\/v2\/pages\/20\/revisions"}],"predecessor-version":[{"id":23,"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=\/wp\/v2\/pages\/20\/revisions\/23"}],"wp:attachment":[{"href":"https:\/\/www.globalenergy.com.qa\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}